English
 
Privacy Policy Disclaimer
  Advanced SearchBrowse

Item

ITEM ACTIONSEXPORT

Released

Journal Article

CO2SINK-From site characterisation and risk assessment to monitoring and verification: One year of operational experience with the field laboratory for CO2 storage at Ketzin, Germany

Authors
/persons/resource/wuerdem

Würdemann,  Hilke
CGS Centre for Geological Storage, Geoengineering Centres, GFZ Publication Database, Deutsches GeoForschungsZentrum;
ICGR International Center for Geothermal Research, Geoengineering Centres, GFZ Publication Database, Deutsches GeoForschungsZentrum;

/persons/resource/fmoeller

Möller,  Fabian
CGS Centre for Geological Storage, Geoengineering Centres, GFZ Publication Database, Deutsches GeoForschungsZentrum;

/persons/resource/mkuehn

Kühn,  Michael
CGS Centre for Geological Storage, Geoengineering Centres, GFZ Publication Database, Deutsches GeoForschungsZentrum;

Heidug,  W.
External Organizations;

Christensen,  N. P.
External Organizations;

Borm,  G.
External Organizations;

Schilling,  F. R.
External Organizations;

External Ressource
No external resources are shared
Fulltext (public)

15975.pdf
(Any fulltext), 925KB

Supplementary Material (public)
There is no public supplementary material available
Citation

Würdemann, H., Möller, F., Kühn, M., Heidug, W., Christensen, N. P., Borm, G., Schilling, F. R. (2010): CO2SINK-From site characterisation and risk assessment to monitoring and verification: One year of operational experience with the field laboratory for CO2 storage at Ketzin, Germany. - International Journal of Greenhouse Gas Control, 4, 6, 938-951.
https://doi.org/10.1016/j.ijggc.2010.08.010


https://gfzpublic.gfz-potsdam.de/pubman/item/item_242409
Abstract
The CO2SINK pilot project at Ketzin is aimed at a better understanding of geological CO2 storage operation in a saline aquifer. The reservoir consists of fluvial deposits with average permeability ranging between 50 and 100 mDarcy. The main focus of CO2SINK is developing and testing of monitoring and verification technologies. All wells, one for injection and two for observation, are equipped with smart casings (sensors behind casing, facing the rocks) containing a Distributed Temperature Sensing (DTS) and electrodes for Electrical Resistivity Tomography (ERT). The in-hole Gas Membrane Sensors (GMS) observed the arrival of tracers and CO2 with high temporal resolution. Geophysical monitoring includes Moving Source Profiling (MSP), Vertical Seismic Profiling (VSP), crosshole, star and 4-D seismic experiments. Numerical models are benchmarked via the monitoring results indicating a sufficient match between observation and prediction, at least for the arrival of CO2 at the first observation well. Downhole samples of brine showed changes in the fluid composition and biocenosis. First monitoring results indicate anisotropic flow of CO2 coinciding with the "on-time" arrival of CO2 at observation well one (Ktzi 200) and the later arrival at observation well two (Ktzi 202). A risk assessment was performed prior to the start of injection. After one year of operations about 18,000 t of CO2 were injected safely.