Coupled hydro-mechanical simulations demonstrate system integrity at the Ketzin pilot site for CO2 storage

Authors
/persons/resource/kempka

Kempka,  Thomas
5.3 Hydrogeology, 5.0 Earth Surface Processes, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum;

/persons/resource/klappi

Klapperer,  Stefan
4.1 Reservoir Technologies, 4.0 Chemistry and Material Cycles, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum;

/persons/resource/norden

Norden,  Ben
4.1 Reservoir Technologies, 4.0 Chemistry and Material Cycles, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum;

External Ressource
No external resources are shared
Fulltext (public)
There are no public fulltexts stored in GFZpublic
Supplementary Material (public)
There is no public supplementary material available
Citation

Kempka, T., Klapperer, S., Norden, B. (2014): Coupled hydro-mechanical simulations demonstrate system integrity at the Ketzin pilot site for CO2 storage. - In: Alejano, L., Perucho, A., Olalla, C., Jiménez, R. (Eds.), Rock Engineering and Rock Mechanics: Structures in and on Rock Masses; Proceedings of EUROCK 2014, ISRM European Regional Symposium, Leiden : CRC Press/Balkema, 1317-1322.
https://doi.org/10.1201/b16955-229


Cite as: https://gfzpublic.gfz-potsdam.de/pubman/item/item_432931
Abstract
An integrated hydro-mechanical assessment of the Ketzin pilot site for CO2 storage, Germany, has been carried out in the present study. For that purpose, history matched reservoir simulation models were coupled with regional-scale hydro-mechanical simulation models. Simulation results reveal maximum vertical displacements of about 6mm at the reservoir top and 4mm at the ground surface. Neither shear nor tensile failure is observed in the hydro-mechanical model at the end of the simulation time. Consequently, reservoir, caprock and fault integrity are maintained during the entire CO 2 storage operation. © 2014 Taylor & Francis Group, London.