hide
Free keywords:
permanent temperature monitoring, cementation, energy > energy source > renewable energy source, industrial process > drilling
Abstract:
The fiber optic cable was installed down to 832 m behind the production casing of a 9 5/8" (445-2932 m) and 9 7/8" (0 - 445 m) production casing in well RN-15/DEEPEGS/IDDP-2 in the Reykjanes geothermal field, SW Iceland (depth reference: surface). Fiber optic distributed temperature data was acquired (campaign based) during cementation (09/2016) of the production casing, at the end of the cold fluid injection (09/2018) as well during the onset of well stimulation (10/2019-04/2020).