date: 2019-01-30T13:11:23Z pdf:PDFVersion: 1.6 pdf:docinfo:title: Earth and Rock-Filled Dam Monitoring by High-Resolution X-Band Interferometry: Gongming Dam Case Study xmp:CreatorTool: LaTeX with hyperref package access_permission:can_print_degraded: true subject: Middle-sized earth- and rock-filled dams with clay cores continue to settle by approximately 0.5?1.5% of their height for approximately 1?3 years after their construction phase. This paper investigates the use of high-resolution spaceborne Synthetic aperture Radar (SAR) interferometry to monitor this settlement process, with the case of the Gongming dam in China. The varieties of slope foreshortening and stretching in the radar coordinates are attributed to the radar?s local incidence angle and the dam?s slope heading, which are analysed in detail. Focusing on the embankment slope settlement analysis, the equations for calculating foreshortening and the line-of-sight deformation decomposition are derived in detail for the adjustment and data fusing. The scattering characteristics of different materials on the dam surface are analysed, including the grass slope, concrete slope, top road (crest), top wall, step, and ditch. According to the analysis of the precipitation data from a local meteorological station, the coherence losses on the slopes are mainly caused by surface moisture. Both the TerraSAR-X Spotlight (TSX-SL) data and the COSMO-SkyMed Strip Mode (CSK-SM) data are analysed by the stacking method to assess the slopes? deformations. The TSX-SL data results show the highest rate of settlement as 2 cm/yr on the top of the dam slope, consistent with the clay core shrinking process. The CSK-SM data show a similar trend in the lower part of the dam slope but underestimate the deformation in the upper part of the slope. dc:format: application/pdf; version=1.6 pdf:docinfo:creator_tool: LaTeX with hyperref package access_permission:fill_in_form: true pdf:encrypted: false dc:title: Earth and Rock-Filled Dam Monitoring by High-Resolution X-Band Interferometry: Gongming Dam Case Study modified: 2019-01-30T13:11:23Z cp:subject: Middle-sized earth- and rock-filled dams with clay cores continue to settle by approximately 0.5?1.5% of their height for approximately 1?3 years after their construction phase. This paper investigates the use of high-resolution spaceborne Synthetic aperture Radar (SAR) interferometry to monitor this settlement process, with the case of the Gongming dam in China. The varieties of slope foreshortening and stretching in the radar coordinates are attributed to the radar?s local incidence angle and the dam?s slope heading, which are analysed in detail. Focusing on the embankment slope settlement analysis, the equations for calculating foreshortening and the line-of-sight deformation decomposition are derived in detail for the adjustment and data fusing. The scattering characteristics of different materials on the dam surface are analysed, including the grass slope, concrete slope, top road (crest), top wall, step, and ditch. According to the analysis of the precipitation data from a local meteorological station, the coherence losses on the slopes are mainly caused by surface moisture. Both the TerraSAR-X Spotlight (TSX-SL) data and the COSMO-SkyMed Strip Mode (CSK-SM) data are analysed by the stacking method to assess the slopes? deformations. The TSX-SL data results show the highest rate of settlement as 2 cm/yr on the top of the dam slope, consistent with the clay core shrinking process. The CSK-SM data show a similar trend in the lower part of the dam slope but underestimate the deformation in the upper part of the slope. pdf:docinfo:subject: Middle-sized earth- and rock-filled dams with clay cores continue to settle by approximately 0.5?1.5% of their height for approximately 1?3 years after their construction phase. This paper investigates the use of high-resolution spaceborne Synthetic aperture Radar (SAR) interferometry to monitor this settlement process, with the case of the Gongming dam in China. The varieties of slope foreshortening and stretching in the radar coordinates are attributed to the radar?s local incidence angle and the dam?s slope heading, which are analysed in detail. Focusing on the embankment slope settlement analysis, the equations for calculating foreshortening and the line-of-sight deformation decomposition are derived in detail for the adjustment and data fusing. The scattering characteristics of different materials on the dam surface are analysed, including the grass slope, concrete slope, top road (crest), top wall, step, and ditch. According to the analysis of the precipitation data from a local meteorological station, the coherence losses on the slopes are mainly caused by surface moisture. Both the TerraSAR-X Spotlight (TSX-SL) data and the COSMO-SkyMed Strip Mode (CSK-SM) data are analysed by the stacking method to assess the slopes? deformations. The TSX-SL data results show the highest rate of settlement as 2 cm/yr on the top of the dam slope, consistent with the clay core shrinking process. The CSK-SM data show a similar trend in the lower part of the dam slope but underestimate the deformation in the upper part of the slope. pdf:docinfo:creator: Tao Li, Mahdi Motagh, Mingzhou Wang, Wei Zhang, Chunlong Gong, Xunan Xiong, Jinping He, Lulu Chen and Jingnan Liu PTEX.Fullbanner: This is pdfTeX, Version 3.14159265-2.6-1.40.18 (TeX Live 2017/W32TeX) kpathsea version 6.2.3 meta:author: Tao Li, Mahdi Motagh, Mingzhou Wang, Wei Zhang, Chunlong Gong, Xunan Xiong, Jinping He, Lulu Chen and Jingnan Liu trapped: False meta:creation-date: 2019-01-26T04:53:51Z created: Sat Jan 26 05:53:51 CET 2019 access_permission:extract_for_accessibility: true Creation-Date: 2019-01-26T04:53:51Z Author: Tao Li, Mahdi Motagh, Mingzhou Wang, Wei Zhang, Chunlong Gong, Xunan Xiong, Jinping He, Lulu Chen and Jingnan Liu producer: pdfTeX-1.40.18 pdf:docinfo:producer: pdfTeX-1.40.18 dc:description: Middle-sized earth- and rock-filled dams with clay cores continue to settle by approximately 0.5?1.5% of their height for approximately 1?3 years after their construction phase. This paper investigates the use of high-resolution spaceborne Synthetic aperture Radar (SAR) interferometry to monitor this settlement process, with the case of the Gongming dam in China. The varieties of slope foreshortening and stretching in the radar coordinates are attributed to the radar?s local incidence angle and the dam?s slope heading, which are analysed in detail. Focusing on the embankment slope settlement analysis, the equations for calculating foreshortening and the line-of-sight deformation decomposition are derived in detail for the adjustment and data fusing. The scattering characteristics of different materials on the dam surface are analysed, including the grass slope, concrete slope, top road (crest), top wall, step, and ditch. According to the analysis of the precipitation data from a local meteorological station, the coherence losses on the slopes are mainly caused by surface moisture. Both the TerraSAR-X Spotlight (TSX-SL) data and the COSMO-SkyMed Strip Mode (CSK-SM) data are analysed by the stacking method to assess the slopes? deformations. The TSX-SL data results show the highest rate of settlement as 2 cm/yr on the top of the dam slope, consistent with the clay core shrinking process. The CSK-SM data show a similar trend in the lower part of the dam slope but underestimate the deformation in the upper part of the slope. Keywords: spotlight; earth- and rock-fill dam; InSAR; correlation; TerraSAR-X; hydraulic structural design access_permission:modify_annotations: true dc:creator: Tao Li, Mahdi Motagh, Mingzhou Wang, Wei Zhang, Chunlong Gong, Xunan Xiong, Jinping He, Lulu Chen and Jingnan Liu description: Middle-sized earth- and rock-filled dams with clay cores continue to settle by approximately 0.5?1.5% of their height for approximately 1?3 years after their construction phase. This paper investigates the use of high-resolution spaceborne Synthetic aperture Radar (SAR) interferometry to monitor this settlement process, with the case of the Gongming dam in China. The varieties of slope foreshortening and stretching in the radar coordinates are attributed to the radar?s local incidence angle and the dam?s slope heading, which are analysed in detail. Focusing on the embankment slope settlement analysis, the equations for calculating foreshortening and the line-of-sight deformation decomposition are derived in detail for the adjustment and data fusing. The scattering characteristics of different materials on the dam surface are analysed, including the grass slope, concrete slope, top road (crest), top wall, step, and ditch. According to the analysis of the precipitation data from a local meteorological station, the coherence losses on the slopes are mainly caused by surface moisture. Both the TerraSAR-X Spotlight (TSX-SL) data and the COSMO-SkyMed Strip Mode (CSK-SM) data are analysed by the stacking method to assess the slopes? deformations. The TSX-SL data results show the highest rate of settlement as 2 cm/yr on the top of the dam slope, consistent with the clay core shrinking process. The CSK-SM data show a similar trend in the lower part of the dam slope but underestimate the deformation in the upper part of the slope. dcterms:created: 2019-01-26T04:53:51Z Last-Modified: 2019-01-30T13:11:23Z dcterms:modified: 2019-01-30T13:11:23Z title: Earth and Rock-Filled Dam Monitoring by High-Resolution X-Band Interferometry: Gongming Dam Case Study xmpMM:DocumentID: uuid:8261aa9d-e898-45c6-acf1-aa75c2fba802 Last-Save-Date: 2019-01-30T13:11:23Z pdf:docinfo:keywords: spotlight; earth- and rock-fill dam; InSAR; correlation; TerraSAR-X; hydraulic structural design pdf:docinfo:modified: 2019-01-30T13:11:23Z meta:save-date: 2019-01-30T13:11:23Z pdf:docinfo:custom:PTEX.Fullbanner: This is pdfTeX, Version 3.14159265-2.6-1.40.18 (TeX Live 2017/W32TeX) kpathsea version 6.2.3 Content-Type: application/pdf X-Parsed-By: org.apache.tika.parser.DefaultParser creator: Tao Li, Mahdi Motagh, Mingzhou Wang, Wei Zhang, Chunlong Gong, Xunan Xiong, Jinping He, Lulu Chen and Jingnan Liu dc:subject: spotlight; earth- and rock-fill dam; InSAR; correlation; TerraSAR-X; hydraulic structural design access_permission:assemble_document: true xmpTPg:NPages: 21 access_permission:extract_content: true access_permission:can_print: true pdf:docinfo:trapped: False meta:keyword: spotlight; earth- and rock-fill dam; InSAR; correlation; TerraSAR-X; hydraulic structural design access_permission:can_modify: true pdf:docinfo:created: 2019-01-26T04:53:51Z