English
 
Privacy Policy Disclaimer
  Advanced SearchBrowse

Item

ITEM ACTIONSEXPORT
  CLEAN : CO2 Large-Scale Enhanced Gas Recovery in the Altmark Natural Gas Field

Kühn, M., Münch, U. (Eds.)(2013): CLEAN: CO2 Large-Scale Enhanced Gas Recovery in the Altmark Natural Gas Field, (GEOTECHNOLOGIEN Science Report; No. 19; Advanced Technologies in Earth Sciences).
https://doi.org/10.1007/978-3-642-31677-7

Item is

Files

show Files

Locators

show

Creators

show
hide
 Creators:
Kühn, Michael1, Editor              
Münch, Ute2, Editor              
Affiliations:
15.3 Hydrogeology, 5.0 Earth Surface Processes, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum, ou_146047              
2Staff Scientific Executive Board, GFZ Publication Database, Deutsches GeoForschungsZentrum, ou_146063              

Content

show
hide
Free keywords: -
 DDC: 550 - Earth sciences
 Abstract: CLEAN was a scientific programme in support of a pilot Enhanced Gas Recovery (EGR) project which was designed to be carried out in cooperation with the site owner GDF SUEZ E&P Deutschland GmbH (GDF SUEZ). This joint research project was conducted in the years 2008 – 2011 by a German research and development (R&D) alliance of 16 partners from science and industry. The Altensalzwedel block, a separate geological section of the Altmark natural gas field, which is almost completely exploited, had been selected by GDF SUEZ for this purpose. The operator also developed and provided the infrastructure required for the implementation of the pilot project above and below ground. The aim of the project CLEAN was to develop and test technologies, which enable to store for a long time significant amounts of CO2 economically, ecologically and safe in a depleted natural gas reservoir. Despite the fact that permission for active injection was not issued by the mining authority during the period of the project, important results fostering the understanding of processes linked with EGR were achieved. These provide the technological, logistic and conceptual prerequisites for implementing a CO2-based EGR project in the Altmark and provide a benchmark for similar projects in the world.

Details

show
hide
Language(s):
 Dates: 2013
 Publication Status: Finally published
 Pages: -
 Publishing info: -
 Table of Contents: -
 Rev. Type: -
 Identifiers: eDoc: 19986
GFZPOF: PT4 Georesources: Sustainable Use and Geoengineering
DOI: 10.1007/978-3-642-31677-7
 Degree: -

Event

show

Legal Case

show

Project information

show

Source 1

show
hide
Title: GEOTECHNOLOGIEN Science Report ; No. 19 ; Advanced Technologies in Earth Sciences
Source Genre: Series
 Creator(s):
Affiliations:
Publ. Info: -
Pages: - Volume / Issue: - Sequence Number: - Start / End Page: - Identifier: -