Deutsch
 
Datenschutzhinweis Impressum
  DetailsucheBrowse

Datensatz

DATENSATZ AKTIONENEXPORT

Freigegeben

Zeitschriftenartikel

Marine Gravimetry Activities on the Baltic Sea in the Framework of the EU Project FAMOS

Urheber*innen
/persons/resource/foer

Förste,  C.
1.2 Global Geomonitoring and Gravity Field, 1.0 Geodesy, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum;

/persons/resource/sinem

Ince,  E. Sinem
1.2 Global Geomonitoring and Gravity Field, 1.0 Geodesy, Departments, GFZ Publication Database, Deutsches GeoForschungsZentrum;

Johann,  F.
External Organizations;

Schwabe,  J.
External Organizations;

Liebsch,  G.
External Organizations;

Externe Ressourcen
Es sind keine externen Ressourcen hinterlegt
Volltexte (frei zugänglich)

5004020.pdf
(Verlagsversion), 2MB

Ergänzendes Material (frei zugänglich)
Es sind keine frei zugänglichen Ergänzenden Materialien verfügbar
Zitation

Förste, C., Ince, E. S., Johann, F., Schwabe, J., Liebsch, G. (2020): Marine Gravimetry Activities on the Baltic Sea in the Framework of the EU Project FAMOS. - ZfV: Zeitschrift für Geodäsie, Geoinformation und Landmanagement, 145, 5, 287-294.
https://doi.org/10.12902/zfv-0317-2020


Zitierlink: https://gfzpublic.gfz-potsdam.de/pubman/item/item_5004020
Zusammenfassung
FAMOS (Finalizing Surveys for the Baltic Motorways of the Sea) is a recently run project which was supported by EU to improve the safety of ship navigation on the Baltic Sea. One task of FAMOS was to work on a common height reference for the Baltic Sea, the Baltic Sea Chart Datum 2000 (BSCD2000), which will be based on a new gravimetric geoid for this sea. The German institutions German Research Centre for Geosciences (GFZ), Federal Agency for Cartography and Geodesy (BKG), Federal Maritime and Hydrographic Agency (BSH) and Technical University of Darmstadt performed several marine gravimetry surveys to contribute to this project. The primary measurement equipment was GFZ’s Chekan-AM gravimeter. On two of these campaigns an iMAR strapdown inertial measurement unit (IMU) was used together with the Chekan. The data records from both instruments are of very good consistency. Since the FAMOS project ended ahead of the planned schedule already in 2019, finalization of the new chart Datum is now coordinated by the Chart Datum Working Group within the Baltic Sea Hydrographic Commission. It is planned to implement the new BSCD2000 by 2023.